MEP Design and T24 Report for Remodel and Addition at Veterinarian Hospital

At Innodez, we are dedicated to delivering advanced MEP design and engineering solutions that align with the latest Title 24 energy compliance standards in California. For this project, we developed comprehensive mechanical, electrical, and plumbing (MEP) systems designed to optimize energy efficiency, ensure compliance with local building codes, and provide a sustainable, cost-effective solution for the property.

Our Approach to Title 24 and MEP Design:

Title 24 is a critical regulation in California, aimed at improving energy efficiency in buildings. Our team carefully evaluated the project’s unique needs, ensuring that every aspect of the design complied with these rigorous standards. By integrating cutting-edge MEP engineering techniques, we not only met compliance requirements but also enhanced the building’s overall functionality and sustainability.

Key Highlights of the MEP Design:

1. Energy-Efficient HVAC System Design:

Our HVAC solutions prioritized energy efficiency and indoor comfort. Utilizing advanced modeling tools, we designed a system that balances heating, ventilation, and air conditioning needs while minimizing energy consumption. This ensures year-round comfort for occupants while reducing the building’s carbon footprint.

2. Lighting and Electrical Systems:

To meet Title 24 requirements, we incorporated high-efficiency lighting systems and modern electrical infrastructure. From LED lighting to motion sensors and smart energy management systems, our design maximized energy savings without compromising on functionality or aesthetics.

3. Sustainable Plumbing Solutions:

Our plumbing design focused on water conservation, featuring low-flow fixtures and water-efficient systems that align with California’s sustainability goals. This not only reduced water usage but also contributed to the building’s overall energy efficiency.

4. Title 24 Compliance Modeling and Documentation:

As part of the project, we conducted detailed energy simulations and provided all necessary documentation to demonstrate compliance with Title 24 standards. Our meticulous approach ensured that the project met all regulatory requirements while achieving optimal performance.

Challenges and Solutions:

One of the primary challenges of this project was integrating energy-efficient systems into an existing architectural design. Our team overcame this by leveraging state-of-the-art engineering tools to customize solutions that fit seamlessly into the building’s layout. From addressing space constraints to optimizing system performance, we delivered a design that exceeded expectations.

Benefits Delivered:

  • Energy Savings: Our MEP design significantly reduced the building’s energy consumption, lowering operating costs.
  • Sustainability: The project aligns with California’s ambitious energy goals, contributing to a greener future.
  • Comfort and Usability: Occupants benefit from enhanced comfort and modern amenities, powered by reliable and efficient systems.

Why Choose Innodez for MEP and Title 24 Compliance?

At Innodez, we combine expertise in MEP engineering with an in-depth understanding of Title 24 standards to deliver designs that are both innovative and compliant. Whether you’re starting a new project or retrofitting an existing building, our team is equipped to meet your needs with tailored, sustainable solutions.

Contact Us:

Ready to elevate your project with expert MEP design and Title 24 compliance services? Get in touch with Innodez today. Our experienced engineers are here to help you achieve your vision while staying energy efficient and compliant.

InnoDez was tasked by Pacific Grove Animal Hospital to provide MEP Design and Engineering plans and Title 24 Report for an addition project at the building.

Project Address:

1023 Austin Ave. Pacific Grove, CA 93950

Project Description:

  • Remodel an existing animal hospital adding 300 SF to create separate waiting rooms.
  • Rework of old waiting room and adjusting the immediate perimeter of the building for the new additions’ entries and new drainage.

Project Scope of Work:

MEP Design and Engineering and Title 24 Report for Remodel and Addition

Electrical Design:

  • Lighting layout
  • Power layout
  • Single line diagram
  • Panelboard schedule

Plumbing Design:

  • Drainage layout
  • Water supply layout
  • Plumbing riser diagram

Mechanical Design:

  • Duct layout
  • Heating cooling calculation report
  • AC unit and outside air schedule

Project Lead Time: 7 Days

Please follow and like us: